M Block Refurbishment
Southgate & Barnet College chopson 6 February 2020
The Brief
Brykol were approached for our experienced input to develop the college’s planned refurbishment of an existing 5 storey building on their Southgate site in North London.
Design

A design had been initially produced by a mechanical consulting practice for the project. Brykol helped further develop this plan with the clients budget and goals in mind. The requirement was to replace all the buildings existing, old and inefficient air & water services with a more economical solution whilst maintaining a high standard.

Design

A design had been initially produced by a mechanical consulting practice for the project. Brykol helped further develop this plan with the clients budget and goals in mind. The requirement was to replace all the buildings existing, old and inefficient air & water services with a more economical solution whilst maintaining a high standard.

The Plan

This involved assessing the initial design and working with the consulting engineers to propose alternative solutions to achieve the college's goals. This was achieved and all five floors of the building were refurbished to incorporate comfort heating & cooling and fresh air ventilation to numerous teaching & staff areas as well as the remodelling of the toilet blocks on each floor.

In addition to the public floor areas, works were also carried out on the sites main heating and hot water plant to reduce its energy consumption.

The Plan

This involved assessing the initial design and working with the consulting engineers to propose alternative solutions to achieve the college's goals. This was achieved and all five floors of the building were refurbished to incorporate comfort heating & cooling and fresh air ventilation to numerous teaching & staff areas as well as the remodelling of the toilet blocks on each floor.

In addition to the public floor areas, works were also carried out on the sites main heating and hot water plant to reduce its energy consumption.

bry-kol-2-HVAC-System
An efficient and more economical HVAC system
bry-kol-2-refurb
Refurbished building
bry-kol-2-toilet-blocks
Remodelling of the toilet blocks

The overall project took nine months in total to an approximate value of £650K. The project was completed on time and within budget, much to the client's satisfaction.

The overall project took nine months in total to an approximate value of £650K. The project was completed on time and within budget, much to the client's satisfaction.

Assessment of initial
design work
01
Existing plans were developed further by Brykol, taking into account budget, and
project goals
02
Propose alternative and improved design and installation solutions in order to meet the client's needs, goals and budget
03
All five floors of the building were refurbished including: Heating, ventilation and air conditioning installation across the entire building
04
Complete remodel and installation of toilet blocks
to each floor
05
In Summary
Southgate & Barnet College
Assessment of initial design work
01
Existing plans were developed further by Brykol, taking into account budget,
and project goals
01
Propose alternative and improved design and installation solutions in order to meet
the client's needs, goals and budget
01
All five floors of the building were refurbished including: Heating, ventilation and air conditioning installation across the entire building
01
Complete remodel and installation of toilet blocks
to each floor
01
BARNET SOUTHGATE COLLEGE